Project
Steel frame pump room
This is the steel frame for a pump room. Its weight? Approximately 8 tonnes. The entire structure was prefabricated in the workshop of DFK-Steel in Gorinchem. It was assembled in the centre of the workshop, giving our specialists ample space to carry out their work safely and precisely. In this photo, the structure is being transported to the paint shop. The pump room will house two pumps connected to an adjacent water tank. The installation will be used as part of an industrial water transport system.

Do you have a steel project?
We are ready to support you with advice and execution.



